Burj Khalifa: Perbedaan antara revisi

Konten dihapus Konten ditambahkan
Cmonusadapa456 (bicara | kontrib)
Taylor 49 (bicara | kontrib)
cost
Baris 7:
|status = Selesai
|year_started built = 2004
|antenna_spire = {{convert|828|m|ft|0|abbr=on}}<ref name="DubaiOneInauguration"/>
|roof = {{convert|828|m|ft|0|abbr=on}}<ref name="CTBUHdb">{{cite web|url=http://buildingdb.ctbuh.org/?do=building&building_id=3|title=CTBUH Tall Buildings Database: Burj Khalifa|publisher=[[CTBUH]]|accessdate=2010-02-11}}</ref>
|top_floor = {{convert|621.3|m|ft|0|abbr=on}}<ref name="CTBUHdb"/>
|height_of_concrete_section = {{convert|585.7|m|ft|0|abbr=on}}
|floor_count= 160 lantai yang dapat dihuni<ref name="Baldwin">{{cite news|url=http://www.xpress4me.com/news/uae/dubai/20007194.html|title=No more habitable floors to Burj Dubai|last=Baldwin|first=Derek|publisher=''[[XPRESS (newspaper)|XPRESS]]''|date=1 Mei 2008|accessdate=1 Mei 2008}}</ref>
|groundbreaking = 21 September 2004
<!-- Please do not change the projected completion date below without citing an official word from the developers saying anything different -->
|opening= 4 Januari 2010<ref name="Emporis">{{cite web|url=http://www.emporis.com/en/wm/bu/?id=burjdubai-dubai-unitedarabemirates|title=Burj Dubai, Dubai, at Emporis.com|publisher=''[[Emporis]]''|accessdate=1 March 2007}}</ref><ref name="opening">{{cite news|url=http://gulfnews.com/business/property/uae/official-opening-of-iconic-burj-dubai-announced-1.523471|title=Official Opening of Iconic Burj Dubai Announced|publisher=''Gulfnews''|date=4 November 2009|accessdate=4 November 2009}}</ref>
|use = ''Mixed-use''
|floor_area = {{convert|334000|m2|sqft|-2|abbr=on}}
|cost = 1.5 [[Dolar Amerika Serikat|GUSD]]
|cost=
|developer = [[Emaar Properties|Emaar]]
|architect = [[Skidmore, Owings and Merrill]]
|engineer = [[William F. Baker (engineer)|Bill Baker]] at SOM<ref>{{cite web|url=http://www.wired.com/culture/design/magazine/15-12/mf_baker|title=Engineer Bill Baker Is the King of Superstable 150-Story Structures|last=Blum|first=Andrew|publisher=''Wired''|date=27 November 2007|accessdate=11 March 2008|archiveurl=https://archive.is/VWhn|archivedate=18 September 2012}}</ref>
|contractor= Joint venture between [[Samsung C&T]], [[Besix]]; and [[Arabtec]]<br /> Supervision Consultant & Architect of Record [[Hyder Consulting]]<br /> Consutruction Project Manager [[Turner Construction]]<br />[[Grocon]]<ref name="Contractors">{{cite web|url=http://www.designbuild-network.com/projects/burj/|title=Burj Dubai (Dubai Tower) and Dubai Mall, United Arab Emirates|publisher=''designbuild-network.com''|accessdate=23 March 2009}}</ref><br /> Planning [[Bauer AG]] and [[Middle East Foundations]]<ref name="Contractors"/><br />Lift contractor [[Otis Elevator Company|Otis]]<ref name="Contractors"/><br /> VT consultant [[Lerch Bates]]<ref name="Contractors"/>
}}