Terowongan Seikan: Perbedaan antara revisi

Konten dihapus Konten ditambahkan
Tidak ada ringkasan suntingan
Tidak ada ringkasan suntingan
Baris 11:
| end = [[Hokkaido]]
| stations =
| opened startwork = 13 Maret 19881972
| open = 13 Maret 1988
| owner = [[Japan Railway Construction, Transport and Technology Agency]]
| operator = [[Perusahaan Kereta Api Hokkaido|JR Hokkaido]]
| character =
| linelength =
| tracklengthlength = {{convert|53.85|km|mi}}<br />({{convert|23.3|km|mi}} di bawah laut)
| el = 25 kV AC, 50 Hz
| speed = {{Convert|140|km/h|mph|abbr=on|round=5}}